LO2: Production Plan & Timescales (Gantts Chart)

Production Plan - Gantts Chart


Time scale and contingency:

When the project is started the longest element of the project is gathering and creating assets and integrating them into the website. 

Since The Games Corner TV show is still in production at the time of the website creation lots of content still needs to be created and can drastically delay the creation of the website. This is taken into account of the above production plan which is why gathering resources takes the majority of the production plan.

The contingency also takes into account the finalisation of the website and that it can take less time than granted but this is also to extend the waiting period of gathering resources if necessary. 

Budgeting & Potential Revenue

As previously mentioned there is no budget all equipment and software is either free or provided by UTC Sheffield or Sheffield Live. This does not effect the production of the website at all and no contingency is required.

Also as covered in the treatment the potential revenue does not effect the production since there also will be none since the product is intended for a community radio station TV Channel which cannot make profit.